Comparing the fit between BREEAM assessment and design processes

[thumbnail of Open Access (non-commercial re-use)]
Preview
Text (Open Access (non-commercial re-use)) - Published Version
· Please see our End User Agreement before downloading.
| Preview

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Schweber, L. orcid id iconORCID: https://orcid.org/0000-0002-6069-0002 and Haroglu, H. (2014) Comparing the fit between BREEAM assessment and design processes. Building Research and Information, 42 (3). pp. 300-317. ISSN 1466-4321 doi: 10.1080/09613218.2014.889490

Abstract/Summary

This paper explores the mapping of the environmental assessment process onto design and construction processes. A comparative case study method is used to identify and account for variations in the ‘fit’ between these two processes. The analysis compares eight BREEAM projects (although relevant to LEED, GreenStar, etc.) and distinguishes project-level characteristics and dynamics. Drawing on insights from literature on sustainable construction and assessment methods, an analytic framework is developed to examine the effect of clusters of project and assessment level elements on different types of fit (tight, punctual and bolt-on). Key elements distinguishing between types include: prior working experience with project team members, individual commitment to sustainable construction, experience with sustainable construction, project continuity, project-level ownership of the assessment process, and the nature and continuity of assessor involvement. Professionals with ‘sustainable’ experience used BREEAM judiciously to support their designs (along with other frameworks), but less committed professionals tended to treat it purely as an assessment method. More attention needs to be paid to individual levels of engagement with, and understanding of, sustainability in general (rather than knowledge of technical solutions to individual credits), to ownership of the assessment process and to the potential effect of discontinuities at the project level on sustainable design.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/36183
Identification Number/DOI 10.1080/09613218.2014.889490
Refereed Yes
Divisions Science > School of the Built Environment > Organisation, People and Technology group
Publisher Taylor & Francis
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar