EOQ, JIT and fixed costs in the Ready-mixed concrete industry

Full text not archived in this repository.

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Wu, M. and Low, S.P. (2006) EOQ, JIT and fixed costs in the Ready-mixed concrete industry. International Journal of Production Economics, 102 (1). pp. 167-180. ISSN 0925-5273 doi: 10.1016/j.ijpe.2005.03.002

Abstract/Summary

The successful implementation of just-in-time (JIT) purchasing policy in many industries has prompted many companies that still use the economic order quantity (EOQ) purchasing policy to ponder if they should switch to the JIT purchasing policy. Despite existing studies that directly compare the costs between the EOQ and JIT purchasing systems, this decision is, however, still difficult to be made, especially when price discount has to be considered. JIT purchasing may not always be successful even though plants that adopted JIT operations have experienced or can take advantage of physical space reduction. Hence, the objective of this study is to expand on a classical EOQ with a price discount model to derive the EOQ–JIT cost indifference point. The objective was tested and achieved through a survey and case study conducted in the ready-mixed concrete industry in Singapore.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/12444
Identification Number/DOI 10.1016/j.ijpe.2005.03.002
Refereed Yes
Divisions Science > School of the Built Environment > Construction Management and Engineering
Uncontrolled Keywords EOQ–JIT cost indifference point, Price discount, Inventory facility, Ready-mixed concrete