BIM in the Malaysian construction industry: a scientometric review and case study

[thumbnail of 2023-02-24 Tanko AAM.pdf]
Preview
Text - Accepted Version
· Please see our End User Agreement before downloading.
| Preview

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Tanko, B. L., Zakka, W. P. and Heng, W. N. (2022) BIM in the Malaysian construction industry: a scientometric review and case study. Engineering, Construction and Architectural Management. ISSN 1365-232X doi: 10.1108/ECAM-04-2021-0324

Abstract/Summary

Purpose – The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of BIM applications in reducing construction waste and enhancing productivity. Design/methodology/approach – First, using 244 bibliographic data extracted from the Scopus database, the paper used scientometric analysis and VOSviewer mapping technique to assess the most impactful publication literature on BIM in Malaysia to identify the existing research gaps. Second, using a structured questionnaire, a total of 100 questionnaires were distributed to practising practitioners who incorporate BIM in the delivery of their projects. Descriptive analysis using cross-tabulation in SPSS software, radar chart, relative importance index and Pearson’s correlation were used to analyze the data. Findings – The research gaps are in the fields of construction projects, buildings, energy efficiency, lifecycle and housing. The findings of the survey indicate that quantity take-off, clash detection, site utilization planning, digital fabrication as well as 4D stimulation were the main BIM applications used among the practitioners in Johor and Selangor. Practical implications – By assessing the state-of-the-art of BIM and BIM applications in this region, the practical implications of this study provide useful insights to construction stakeholders, funding organizations, policymakers, research institutions, professionals, journal editors, reviewers and researchers to understand the overall trend of BIM in Malaysia and its usage. Originality/value – This paper is the first to use science mapping using scientometrics to reveal the current BIM research in “Malaysia only”. Relying on the identified gaps, the study further examined the usage of BIM applications in Malaysian construction projects.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/110730
Identification Number/DOI 10.1108/ECAM-04-2021-0324
Refereed Yes
Divisions Science > School of the Built Environment > Construction Management and Engineering
University of Reading Malaysia
Uncontrolled Keywords BIM, Construction, Productivity, Case study
Publisher Emerald
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar