Balanced approach for tendering practice at the pre-contract stage: the UK practitioner's perspective

[thumbnail of Open Access]
Preview
Text (Open Access) - Published Version
· Available under License Creative Commons Attribution.
· Please see our End User Agreement before downloading.
| Preview
Available under license: Creative Commons Attribution

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Whang, S.-W., Donyavi, S., Flanagan, R. and Kim, S. (2022) Balanced approach for tendering practice at the pre-contract stage: the UK practitioner's perspective. Journal of Civil Engineering and Management, 28 (5). pp. 338-348. ISSN 1822-3605 doi: 10.3846/jcem.2022.16580

Abstract/Summary

Tender documents often lack clarity and are incomplete, making it difficult for contractors to appropriately price projects. A general view is that the quality of tender documents has declined, which has affected the bidding strategies of contractors. However, the academic literature has focused mainly upon the views of contractors. To obtain a more balanced view of tendering practices, in-depth interviews were conducted with 10 practitioners (client, consultant, and contractor) who are involved in a common project at the same time in the UK construction industry. The contractor was satisfied that the quality of tender documents had been consistent. By contrast, both the client and the consultant agreed that the quality of tender documents is an ongoing issue. During the study it was revealed that tendering practice is influenced by the relationship between stakeholders or the unbalanced access to information rather than the accuracy and analysis of tender documentations. Tendering practices and proposed efficient ways of improving the bidding environment were examined. Using the awareness of other project stakeholder’s perspectives, this study can help the contractor to establish suitable tendering practices, and to mitigate tender risk at the bidding stage, which could effectively be implemented in the UK construction industry.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/105137
Identification Number/DOI 10.3846/jcem.2022.16580
Refereed Yes
Divisions Science > School of the Built Environment > Construction Management and Engineering
Uncontrolled Keywords Strategy and Management, Civil and Structural Engineering
Publisher Vilnius Gediminas Technical University
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar