Aouad, G., Hinks, J., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. G. (1998) An IT map for the generic design and construction process protocol. Journal of Construction Procurement, 4 (2). pp. 22-44. ISSN 1358-9180
Awbi, H. B. (1998) Calculation of convective heat transfer coefficients of room surfaces for natural convection. Energy and Buildings, 28 (2). pp. 219-227. ISSN 1872-6178 doi: 10.1016/s0378-7788(98)00022-x
Awbi, H. B. (1998) Energy efficient room air distribution. Renewable Energy, 15 (1-4). pp. 293-299. ISSN 1879-0682 doi: 10.1016/s0960-1481(98)00176-1
Green, S. D.
ORCID: https://orcid.org/0000-0003-1660-5592
(1998)
The technocratic totalitarianism of construction process improvement: a critical perspective.
Engineering, Construction and Architectural Management, 5 (4).
pp. 376-386.
ISSN 0969-9988
doi: 10.1108/eb021090
Green, S. D.
ORCID: https://orcid.org/0000-0003-1660-5592 and Moss, G. W.
(1998)
Value management and post-occupancy evaluation: closing the loop.
Facilities, 16 (1-2).
pp. 34-39.
ISSN 0263-2772
doi: 10.1108/02632779810195839
Lingard, H., Hughes, W.
ORCID: https://orcid.org/0000-0002-0304-8136 and Chinyio, E.
(1998)
The impact of contractor selection method on transaction costs: a review.
Journal of Construction Procurement, 4 (2).
pp. 89-102.
ISSN 1358-9180
Loosemore, M. and Hughes, W.
ORCID: https://orcid.org/0000-0002-0304-8136
(1998)
Reactive crisis management in construction projects.
Journal of Contingencies and Crisis Management, 6 (1).
pp. 23-34.
ISSN 1468-5973
doi: 10.1111/1468-5973.00065
Luck, R. (1998) Annual CREMRU-JCI survey of corporate estate management practices in Europe and North America: 1993-1997. Facilities, 16 (3-4). pp. 82-92. ISSN 0263-2772 doi: 10.1108/02632779810205594
Shao, L., Elmualim, A. A. and Yohannes, I. (1998) Mirror lightpipes: daylighting performance in real buildings. Lighting Research and Technology, 30 (1). pp. 37-44. ISSN 1477-0938 doi: 10.1177/096032719803000106
Luck, R. (1998) Studying the effect of systemisation on design activity. In: Hughes, W. (ed.) 14th Annual ARCOM Conference. ARCOM, pp. 340-346. ISBN 0953416100
Dixon, T.
ORCID: https://orcid.org/0000-0002-4513-6337,
(1998)
Building the web: the Internet and the property profession.
Project Report.
CEM Reading, Reading.
Elmualim, A. (1998) Measurement and modelling of light pipe for energy efficient lighting. In: CIBSE National Lighting Conference, Lancaster University, UK, pp. 410-419. (Unpublished)
Turkbeyler, E. (1998) A numerical study of shock motion in unsteady two-dimensional nozzle flow. In: 6th International Conference on Numerical Methods for Fluid Dynamics by ICFD, 31 March- 4 April 1998, University of Oxford. (Unpublished)
Turkbeyler, E. (1998) A solution-adaptive grid-refinement technique for the 2-D Euler equations. In: Proceedings of International Conference on Advanced Computational Methods in Engineering, 2-4 Sept , University of Ghent, Belgium. (Unpublished)
Hughes, W.
ORCID: https://orcid.org/0000-0002-0304-8136, ed.
(1998)
Proceedings of the 14th annual ARCOM conference.
Association of Researchers in Construction Management, Reading, pp687.
ISBN 0953416100
Hughes, W.
ORCID: https://orcid.org/0000-0002-0304-8136, Hillebrandt, P. and Murdoch, J. R.
(1998)
Financial protection in the UK building industry: a guide for clients and the construction supply chain.
Thomas Telford Publications, London, pp24.
ISBN 0727727176
Hughes, W.
ORCID: https://orcid.org/0000-0002-0304-8136, Hillebrandt, P.M. and Murdoch, J.
(1998)
Financial protection in the UK building industry: bonds, retentions and guarantees.
Taylor & Francis, London, pp208.
ISBN 9780419242901