Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom

[thumbnail of Open Access]
Preview
Text (Open Access) - Published Version
· Please see our End User Agreement before downloading.
| Preview

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Ballesteros-Pérez, P., Smith, S. T. orcid id iconORCID: https://orcid.org/0000-0002-5053-4639, Lloyd-Papworth, J. G. and Cooke, P. (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom. Construction Management and Economics, 36 (12). pp. 666-682. ISSN 0144-6193 doi: 10.1080/01446193.2018.1478109

Abstract/Summary

The impact of (adverse) weather is a common cause of delays, legal claims and economic losses in construction projects. Research has recently been carried out aimed at incorporating the effect of weather in project planning; but these studies have focussed on either a narrow set of weather variables, or a very limited range of construction activities or projects. A method for processing a country’s historical weather data into a set of weather delay maps for some representative standard construction activities is proposed. Namely, sine curves are used to associate daily combinations of weather variables to delay and provide coefficients for expected productivity losses. A complete case study comprising the construction of these maps and the associated sine waves for the UK is presented along with an example of their use in building construction planning. Findings of this study indicate that UK weather extends project durations by an average of 21%. However, using climatological data derived from weather observations when planning could lead to average reductions in project durations of 16%, with proportional reductions in indirect and overhead costs.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/74639
Identification Number/DOI 10.1080/01446193.2018.1478109
Refereed Yes
Divisions Science > School of the Built Environment > Energy and Environmental Engineering group
Publisher Taylor & Francis
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar