Collinge, B. and Connaughton, J.
ORCID: https://orcid.org/0000-0002-8878-8589
(2017)
Mobilizing BIM in a collaborative project environment.
In: Lean & Computing in Construction Congress (LC3)(CIB W78), 4-12 July, 2017, Heraklion, Greece.
Abstract/Summary
This paper reports on the application of BIM methods an innovative project in the UK that is pioneering a new form of project insurance (Integrated Project Insurance) that joins project partners together as a virtual company. The paper examines the processes put in place to optimize BIM usage whilst reviewing the problems and issues encountered; the observations of a researcher being combined with the reflections of the BIM Information Manager. It is noted that mobilizing a comprehensive BIM-centric system is a complex and difficult undertaking, with new roles and responsibilities needing to be created, that put extra pressures on project partners. The positive results of using BIM in a collaborative environment are noted as the findings suggest inclusive contractual arrangements facilitate enhanced BIM use. The insights inform understanding of mobilizing BIM in a collaborative project environment as it is argued that only a fully collaborative project environment can realise the full benefits of BIM.
| Additional Information | All the papers from the IGLC conferences are available for free download. |
| Item Type | Conference or Workshop Item (Paper) |
| URI | https://reading-clone.eprints-hosting.org/id/eprint/72975 |
| Refereed | Yes |
| Divisions | Science > School of the Built Environment > Organisation, People and Technology group |
| Uncontrolled Keywords | BIM, collaboration, Integrated Project Insurance, organization |
| Additional Information | All the papers from the IGLC conferences are available for free download. |
| Download/View statistics | View download statistics for this item |
Downloads
Downloads per month over past year
University Staff: Request a correction | Centaur Editors: Update this record
Download
Download