4D BIM application in AEC industry: impact on integrated project delivery

[thumbnail of Open Access]
Preview
Text (Open Access) - Published Version
· Available under License Creative Commons Attribution.
· Please see our End User Agreement before downloading.
| Preview
Available under license: Creative Commons Attribution

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Umar, U. A., Shafiq, N., Malakahmad, A., Nurudin, M. F., Khamidi, M. F., Farhan, S. A. and Gardezi, S. S. S. (2015) 4D BIM application in AEC industry: impact on integrated project delivery. Research Journal of Applied Sciences, Engineering and Technology, 10 (5). pp. 547-552. ISSN 2040-7459 doi: 10.19026/rjaset.10.2462

Abstract/Summary

As project delivery approaches that are supported by Building Information Modelling (BIM) are continuously acknowledged throughout the Architecture, Engineering and Construction (AEC) industry, an innovative modelling approach called 4D BIM is starting to develop, which associates elements of 3D BIM with time and scheduling information. Traditional construction planning applications like bar charts and network diagrams fail to present and communicate the spatial and temporal or 4D components of construction schedules efficiently. As a result, they do not permit project managers to produce scheduling alternatives quickly to obtain the finest solution to develop a particular design. With 4D modelling, the whole period of a sequence of activities that is executed by those involved in the project can be presented visually. With the rising interest in BIM and the wider use of this and other technological innovations in the AEC industry, 4D BIM tools, which has been broadly employed, is becoming increasingly recognized among fundamental technological fields under BIM. This study aims to highlight and review numerous impacts of 4D applications on Integrated Project Delivery (IPD) in the AEC industry and suggest the ideal strategy to optimize the tools for rapid project delivery.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/69805
Identification Number/DOI 10.19026/rjaset.10.2462
Refereed Yes
Divisions University of Reading Malaysia
Publisher Maxwell Scientific Publisher
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar