Performance evaluation of a field-scale anaerobic baffled reactor as an economic and sustainable solution for domestic wastewater treatment

[thumbnail of Open access]
Preview
Text (Open access) - Published Version
· Available under License Creative Commons Attribution.
· Please see our End User Agreement before downloading.
| Preview
Available under license: Creative Commons Attribution

Please see our End User Agreement.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Saif, Y., Ali, M., Jones, I. M. orcid id iconORCID: https://orcid.org/0000-0002-7738-2516 and Ahmed, S. (2021) Performance evaluation of a field-scale anaerobic baffled reactor as an economic and sustainable solution for domestic wastewater treatment. Sustainability, 13 (18). 10461. ISSN 2071-1050 doi: 10.3390/su131810461

Abstract/Summary

The present study explored the efficiency of a four-chambered anaerobic baffled reactor (ABR) as a cost-effective and sustainable method of organic pollutant and pathogen removal from domestic wastewater, under a range of environmental conditions. An ABR with a circular additional filter at the outlet pipe was constructed to treat wastewater from a residential colony of 108 households with an average inflow of 110 m3/day and a nominal hydraulic retention time (HRT) of 20 h. Analysis of the chemical oxygen demand (COD), total nitrogen, sulfate and phosphate load, and total coliform removal for 2 years of operation, 2015 and 2017, showed a COD of 46, sulfate load of 28, phosphate load of 51 and total nitrogen of 28 for 2015, compared to a COD of 48, sulfate load of 44, phosphate load of 58 and total nitrogen of 31 for 2017. The lack of a significant effect of sludge removal suggested a stable process. The overall efficiency of the ABR increased in the summer, including for pathogen removal, which was significantly higher during the summer months of both years. Overall, the ABR was found to be able to consistently treat primary wastewater, although tertiary effluent treatment was still required before water reuse or final discharge.

Altmetric Badge

Item Type Article
URI https://reading-clone.eprints-hosting.org/id/eprint/100367
Identification Number/DOI 10.3390/su131810461
Refereed Yes
Divisions Life Sciences > School of Biological Sciences > Biomedical Sciences
Publisher MPDI
Download/View statistics View download statistics for this item

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Search Google Scholar